日韩精品久久一区二区三区_亚洲色图p_亚洲综合在线最大成人_国产中出在线观看_日韩免费_亚洲综合在线一区

Global EditionASIA 中文雙語Fran?ais
China
Home / China / Society

World's longest-span cable-stayed bridge undergoes load test before opening

Xinhua | Updated: 2025-06-19 10:09
Share
Share - WeChat
An aerial drone photo taken on May 24, 2025 shows the Changzhou-Taizhou Yangtze River Bridge under construction in East China's Jiangsu province. [Photo/Xinhua]

NANJING -- The final pre-opening safety checks have begun on the Changtai Yangtze River Bridge, the world's longest-span cable-stayed bridge, as engineers launched a high-stakes week-long load testing campaign on the hybrid rail-road structure early Tuesday in East China's Jiangsu province.

A series of scientifically rigorous load tests will thoroughly evaluate the actual performance of this world-class multifunctional bridge, which will provide crucial data for its subsequent safe operation, according to the Jiangsu provincial transport engineering construction bureau, the bridge's developer.

Spanning 10.03 kilometers, this engineering milestone integrates highways, intercity railways, and local roads across two levels. Its main channel features a record-setting 1,208-meter central span supported by cables, while its two auxiliary channel bridges each boast 388-meter steel arch spans, the longest worldwide for their type.

All load testing occurs exclusively at night to avoid temperature fluctuations affecting the steel-based structure, with over 800 sensors deployed to track micrometer-level structural shifts, according to the bureau.

During the first night's static test, 30 four-axle trucks weighing 1,200 tonnes were positioned like "six vehicles side-by-side on the upper highway deck and four on the lower rail-road deck," according to technicians, mimicking the weight of 800 passenger cars. The trucks remained stationary for eight hours to measure structural responses.

Seven days of trials cover 119 static and 111 dynamic scenarios across all bridge sections. The most intense static test will mobilize 110 trucks weighing 4,400 tonnes simultaneously on the main span, according to the bureau.

Dynamic examinations later this week include simulated traffic flows with braking and bumping sequences.

Scheduled for completion by late 2025, the bridge will slash travel time between Changzhou and Taizhou in Jiangsu province from 80 minutes to 20 minutes, boosting development for the Yangtze economic belt and integration of the Yangtze River delta region.

Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
主站蜘蛛池模板: 日本午夜网站 | 日韩视频久久 | 精品AV一区二区三区久久 | 天天做天天添天天谢 | 999毛片 | 亚洲图片欧洲电影 | 日韩在线观看一区二区不卡视频 | 久久久国产视频 | 青草青在线 | 无人精品乱码一区二区三区 | 国产激情在线观看 | 一区二区三区国产免费 | 一区二区三区视频在线观看 | 97婷婷狠狠成人免费视频 | 狠狠色丁香婷婷久久综合考虑 | 成年人在线观看视频 | 欧美两性人xxxx高清免费 | 亚洲国产网站 | 亚洲国产天堂久久综合226 | 黑人操亚洲人 | 久久国产精品免费一区二区三区 | 精品在线一区二区 | 国产视频大全 | 俄罗斯厕所偷窥视频 | 国产福利免费观看 | 天堂资源最新在线 | 色综合激情 | 色图综合网 | 欧美三级三级三级爽爽爽 | 成人18免费入口 | 欧美一级久久 | 五月久久亚洲七七综合中文网 | 伦理一区二区 | 一级a毛片 | 九九亚洲精品 | 国产91一区二区三区 | 日韩在线操 | 精品国产第一国产综合精品gif | 一级美女 | 日本视频高清免费观看xxx | 日本高清在线中文字幕网 |