国产人人色I色婷婷综合久久中文字幕雪峰I奇米色777欧美一区二区I久热久热aV爽青青在线I国产av喷水I国产伦精品一区二区三区免.费I高潮av在线Iww欧美一级I91天天看I黄a在线91I九一无码中文字幕久久无码色…I丰满国产精品视频二区

From hills to hope

Water project drives development in the highlands of Lesotho

Updated: 2025-07-28 10:39
Share
Share - WeChat
Trucks transport components of the tunnel boring machine on a mountain road in Thaba-Tseka on July 8. YANG GUANG/XINHUA

The 38-kilometer tunnel will be excavated using two hard-rock shielded tunnel boring machines, operating simultaneously from Polihali and Katse Dam.

The first tunnel boring machine began boring from Katse earlier this year. On July 5, a launch ceremony was held for the second tunnel boring machine at the Caledonspoort Border Post in Butha-Buthe, Lesotho. This China-manufactured machine was shipped to Durban Port and assembled at the Polihali site. It is expected to significantly speed up excavation process to meet the slated 2028 completion date.

Speaking at the ceremony, South Africa's High Commissioner to Lesotho Constance Seoposengwe said she believed the new machine would give further impetus to the ongoing work on the project.

|<< Previous 1 2 3 4 5 6 7 8 9 10 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US