日韩精品久久一区二区三区_亚洲色图p_亚洲综合在线最大成人_国产中出在线观看_日韩免费_亚洲综合在线一区

  Home>News Center>China
       
 

Three Gorges Dam to be completed ahead of schedule
(AFP)
Updated: 2006-02-06 16:51

China's Three Gorges Dam, the world's largest hydroelectric power project, will be completed in May this year, nine months ahead of schedule, state media reported.


Water of the Yangtze River rush out from the Three Gorges Dam in this October 2005 file picture. The dam, the world's largest hydroelectric power project, will be completed in May this year, nine months ahead of schedule, state media reported.[AFP]
The project, which was launched in 1993 in the middle reaches of China's longest river, the Yangtze, will have cost 180 billion yuan (22 billion dollars) and required 16 million cubic metres (560 million cubic feet) of concrete, Xinhua news agency said.

It will officially be completed in three months' time when the main dam has concrete poured to 185 meters (610 feet) above sea level, according to Xinhua.

Xinhua, which cited Cao Guangjing, vice-manager of the China Three Gorges Project Corporation, did not explain why the project will be finished early.

China's government says the dam, with a length of 2,309 meters, will generate much needed power, prevent flooding and benefit shipping.

But the scheme has been heavily criticized for its huge cost and its unproven capacity to control floods.

Critics have also cited environmental problems, including silt accumulation and pollution controls in hundreds of cities and villages that have been created because of the dam.

Also, 1.2 million people will have been relocated by the time the project is completed.

Xinhua said the project had been built in three phases, the first phase from 1993 to 1997. That included the Yangtze being dammed at the Three Gorges area for the first time on November 8, 1997.

Workers began pouring concrete for the dam in late 1998 from the northern bank of the Yangtze and completed most of the structure in October 2002, Xinhua said.

Concrete pouring for the final section of the dam close to the southern bank began in July 2003.

Fourteen of the 26 generators needed for the project have been installed. Once all the generators are in place, they will have a combined capacity of 18.2 million kilowatt-hours of electricity, Xinhua said.



Waiting for jobs
Snow fun
Registration for examination
  Today's Top News     Top China News
 

New protests erupt in cartoon row, restraint urged

 

   
 

2 Chinese shot dead in S. African robbery

 

   
 

SEPA calls for quick reporting of pollution

 

   
 

Iran tells nuke agency to remove cameras

 

   
 

Energy law aims at power conservation

 

   
 

DPRK-Japan talks slow over abduction issue

 

   
  Energy law aims at power conservation
   
  Heavy snowfall hits large areas of China
   
  2 Chinese shot dead in S. African robbery
   
  SEPA calls for quick reporting of pollution
   
  Online piracy campaign a success
   
  Hotels to become environmentally friendly
   
 
  Go to Another Section  
 
 
  Story Tools  
   
Manufacturers, Exporters, Wholesalers - Global trade starts here.
Advertisement
         
主站蜘蛛池模板: 久久久精品一区二区三区 | 久久99精品国产麻豆婷婷洗澡 | 亚洲天堂中文字幕 | 天天插天天操 | 日韩黄色网| 日韩精品视频美在线精品视频 | 欧美 日韩 中文 | 99久热 | 久久久久在线观看 | 一级片黑人 | 亚洲 欧美日韩 国产 中文 | 97色在线| 亚洲综合色站 | 亚洲精品午夜一区二区 | 欧美成人影院在线观看三级 | 在线观看特色大片免费网站 | 香蕉视频在线观看免费国产婷婷 | 女人被男人狂躁下面在线观看 | www.天天色.com| 国产真实乱freesex | 日本黄色一级视频 | 日出水了视频大全 | 欧美国产日韩在线 | 久久亚洲美女久久久久 | 亚洲高清成人欧美动作片 | 香港三级台湾三级在线播放徐 | 香蕉久久一区二区不卡无毒影院 | 亚洲无线视频 | 在线观看成人 | 亚洲av毛片一区二区久久 | 国产精品免费播放 | 精品在线一区 | 一级一级毛片免费看 | 91精品视频免费在线观看 | 在线一区二区三区 | 国产精品五区 | 国产黄视频在线观看 | 日韩精品一区二区三区不卡 | 国产成人视屏 | 久久99精品国产麻豆婷婷 | 免费国产成人高清视频网站 |