日韩精品久久一区二区三区_亚洲色图p_亚洲综合在线最大成人_国产中出在线观看_日韩免费_亚洲综合在线一区

 
 

Home/News

CEEC: No.2 unit of Warora Project runs up successfully

Updated: 2013-08-05

On Aug 5 (local time), the No.2 unit of Warora 2*300MW project, which was undertaken by CEEC, was successfully set to a constant speed of 3,000 RPM, with satisfactory main technical indicators such as turbine vibration and bushing temperature, etc.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.